Get a BOM range, NRE estimate, DFM blockers, certification path, and first-run plan in 10 minutes.
No equity. No MOQ surprises. Just engineering.
Finding the right manufacturing partner shouldn't be.
Most factories want 10K+ units. We start at 1,000.
You get a clear, fixed NRE quote before any work starts.
NDA + IP assignment standard on every engagement. Your designs stay yours.
Native English + Mandarin team. We work your hours.
We run DFM checks at the design stage, not after you've committed to tooling.
FCC, CE, UL, SRRC — we handle the paperwork, testing, and timeline.
A clear, predictable path from your idea to manufactured product.
Share your concept. We assess feasibility, BOM, and ballpark cost.
Schematic, PCB layout, mechanical design, firmware architecture.
Optimize for manufacturability. 3–5 functional prototypes.
Injection molds, jigs, fixtures. Component sourcing from 3,000+ local suppliers.
50–500 units. Test assembly line, QC process, packaging.
Scale to 1K, 10K, 100K+. Ongoing QC, logistics, fulfillment.
Plan your product before your first factory visit.
Input your specs, get a manufacturing cost ballpark in 60 seconds.
Try it✓30-point check for AI hardware design pitfalls.
Start check📋Estimate development cost: engineering, tooling, prototyping.
Estimate🗺FCC, CE, UL, SRRC — which do you need? Timeline + cost.
NavigateAll tools are free to use. No sign-up required.
BOM cost references, DFM checklists, NRE guidelines, certification playbooks — the same data we use every day, free on GitHub. No signup, no email gate.
Not just parts. We build the full device — electronics, enclosure, firmware, packaging.
NRE + per-unit. Pure service. We don't take a piece of your company. Period.
NDA + IP assignment standard on every engagement. Full source files delivered.
We understand edge AI thermal management, antenna design, and battery optimization.
3,000+
Component suppliers in our network
12 wk
Average concept-to-prototype
1K
Minimum pilot run — no 10K gate
Honest differences, not marketing fluff.
| Feature | Breeze | Fictiv / Xometry | HAX / SOSV | Titoma | Trading Company |
|---|---|---|---|---|---|
| Scope | Whole product | Parts only | Accelerator + parts | Whole product | Sourcing only |
| Equity taken | None | None | 6–10% | None | None |
| Minimum order | 1,000 units | 1 unit (parts) | Varies | ~1,000 | 10,000+ |
| Location | Shenzhen | SF + global | SF + Shenzhen | Taiwan | Shenzhen / Yiwu |
| AI hardware focus | Yes | No | Some | Generalist | No |
| Price transparency | Tools upfront | Instant quote | Opaque | Quote-based | Opaque |
| Language | Native EN + ZH | EN | EN | EN | Broken EN |
| IP policy | Assignment standard | Assignment | Varies | Case-by-case | Often unclear |
| Open-source toolkit | Yes (4 tools) | No | No | No | No |
Fixed-price at every stage. No T&M. No scope-creep invoices.
Free
Initial concept review. 30-minute call plus a one-page feasibility note.
$50K – $150K
Engineering to working prototype plus pilot batch. Fixed-price.
$15 – $60 / unit
At 5K volume for typical AI wearables. Scales with volume and complexity.
Complexity (sensors, radios, battery chemistry, certifications) drives the final number. Try the NRE Simulator for a tailored estimate in 60 seconds.
A predictable 12-week path to pilot. Transparent weekly sync.
Week 1
30-minute feasibility call + ballpark cost. Sign NDA.
Week 2–4
Schematic, PCB layout, mechanical CAD, firmware architecture. Weekly sync.
Week 5–8
3–5 functional prototypes. DFM checks. EVT gate.
Week 9–10
Injection molds, jigs, fixtures. Component sourcing from 3,000+ suppliers. DVT.
Week 11–12
50–500 units. Test assembly line, QC process, packaging. PVT.
Week 13+
Ongoing scale to 1K, 10K, 100K+. QC, logistics, fulfillment.
Four operators with 60+ combined years in Shenzhen supply chain, smart hardware, and cross-border delivery.
Founder & CEO
15+ years cross-border operator. Founded AirPop — smart air wearable launched at CES 2021, covered by Tom's Guide, Wired, and Digital Trends. US (Delaware) + HK + Singapore entities. Native English and Chinese. Based in Shenzhen.
Supply Chain + Quality Lead
30 years across industrial valves, PCB, wire harness connectors, smart masks, and rail transit. GE Six Sigma Black Belt — led HX-5 rail NPI. Amphenol Medical cross-border supplier development and compliance lead. Alumni: Tyco, Amphenol, General Electric.
Engineering Lead
10+ years in Shenzhen consumer electronics supply chain. Prototype to mass production for wearables, IoT devices, and audio products. Ground-truth knowledge of the supplier network within 50 km of our office.
Partnerships & Deal Flow
AI hardware incubator and investor network. Qualifies deal flow and connects AI hardware founders with Breeze. Direct relationships with YC/HAX-adjacent teams building their first physical product.
Before Breeze Hardware, our team shipped production at scale:
World's first smart air wearable — CES 2021
Bluetooth respiratory sensor + iOS/Android app + certified mask manufacturing. Global retail launch via AirPopHealth direct and national retailers.
Press: Tom's Guide · Hypebeast · Digital Trends · Wired · ComputerWeekly
Customs, logistics, international delivery
Deep fluency in import/export customs clearance, HS-code classification, commercial invoicing, multi-modal freight (ocean, air, rail), bonded warehouse coordination, and destination-country fulfillment into US, EU, LATAM, and APAC markets.
Hospital surgical tray systems
Regulated medical device packaging — material sourcing, sterility validation, third-party lab testing, and full compliance documentation for EU hospital systems.
Breeze's co-founder Jett Fu is AirPop's founder & CEO. AirPop Halo was delivered by the same supply-chain and engineering team now powering Breeze.
Real questions from founders we've talked with.
NDA + IP assignment is standard on every engagement — signed before any technical discussion. You receive full source files (schematics, PCB files, firmware, mechanical CAD, BOM) at the end of NRE. No hidden clauses, no exclusivity locks.
For most AI wearables and connected devices: NRE ranges from $50K to $150K, per-unit cost $15–$60 at 5K volume. Complexity (sensors, radios, battery chemistry, certifications) drives the range. Try the NRE Simulator for a tailored ballpark in 60 seconds.
8–12 weeks for most AI wearables, reaching a functional EVT prototype. Faster paths exist if you have a working PoC — we've turned around a DVT-ready design in under 6 weeks for projects with mature schematics.
Sub-1K orders require hand-assembly rather than full SMT lines. We can quote, but pricing structure differs — expect $30–$120 per unit at 200–500 volume. For a 100-unit dev run, we usually roll this into NRE.
Yes. We can join mid-stream, integrate your existing BOM, or coordinate with a fab you've already selected. We've also rescued stalled projects — if your current partner isn't delivering, tell us what's broken.
AI hardware is our focus and default. We accept adjacent projects (consumer IoT, wearables, connected health devices) case-by-case. Pure mechanical products or under-500-unit hobby runs are usually a better fit elsewhere.
We run in-house pre-compliance (FCC Part 15, UN38.3 battery, CE RED pre-scan) and coordinate full testing through accredited labs — SGS, TÜV, ETL. Cert timeline and cost are budgeted into your NRE so there are no Week-11 surprises.
NRE: 50% at kickoff, 50% on milestones (usually EVT + PVT gates). Per-unit production: standard T/T 30/70. All fixed-price — no T&M, no scope-creep billing. If scope changes, we scope it as a change order, not a surprise invoice.
Tell us about your project. We'll respond within 24 hours with a preliminary assessment.
Or email us directly at hello@breezehw.com